RKC INSTRUMENT COM-JC Manual de instrucciones Pagina 17

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 106
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 16
4. WIRING
IMR01Y06-E6
11
Terminal numbers and signal details
CC-Link connection terminals
1: DA
2: DB
3: DG
4: SLD
5: FG
Terminal screws
Screws size: M3
Recommended tightening torque: 0.4 Nm (4 kgfcm)
Terminal No. Signal name Symbol Cable color
1 Data A DA Blue
2 Data B DB White
3 Data ground DG Yellow
4 Shield SLD Grounding wire (Shield)
5 Frame ground FG
The CC-Link connecting terminal cannot do on-line installation or dismount for terminal
block of dismount impossibility. The device cannot be replaced unless the link is set offline.
In addition, FG (flame ground) terminal of terminal number 5 is FG in a CC-Link function,
and it is not FG of instrument all.
Ground both ends of the shield wire on the twisted pair cable via the SLD or FG
terminal of each module. In addition, the SLD terminal is internally connected with the
FG terminal.
Do not ground the instrument together with other equipment.
In addition, use grounding wires with across section of 2.0 mm
2
or more. (Ground
resistance: 100 Ω or less)
For cable specifications, connection method and vendor, refer to the website of CC-Link
Partner Association.
http://www.cc-link.org/
Vista de pagina 16
1 2 ... 12 13 14 15 16 17 18 19 20 21 22 ... 105 106

Comentarios a estos manuales

Sin comentarios